{"id":12954,"date":"2026-09-28T13:35:21","date_gmt":"2026-09-28T13:35:21","guid":{"rendered":"https:\/\/classorga.ch\/sia-118-standard-general-contractor-contract\/"},"modified":"2026-09-28T13:35:53","modified_gmt":"2026-09-28T13:35:53","slug":"sia-118-standard-general-contractor-contract","status":"publish","type":"post","link":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/","title":{"rendered":"What the SIA 118 standard guarantees the project owner in a general contractor agreement"},"content":{"rendered":"<p>At the end of 2024, 7&#8217;935 homes were under construction in the canton of Geneva. Behind each one, a contract. And in almost every one of those contracts, a line the project owner signs without reading it, the one that declares the SIA 118 standard applicable.<\/p>\n<p>Yet that line decides what happens on the day a crack appears, a window will not close properly or a subcontractor has not been paid. It sets the deadlines for making a claim, the way the building is handed over and the guarantees the contractor must provide. And since 1 January 2026, the Swiss Code of Obligations has changed the rules on construction defects, which makes that line even more worth reading before you sign.<\/p>\n<figure><img decoding=\"async\" src=\"https:\/\/classorga.ch\/wp-content\/uploads\/2026\/09\/hero-contrat-entreprise-generale-norme-sia-118.webp\" alt=\"General contractor agreement open with coloured tabs and a fountain pen on a site office table, unrolled plans, hard hat and safety vest, a crane visible through the window\" loading=\"lazy\" style=\"width:100%;height:auto;border-radius:6px;margin:2.5em auto;display:block;\" \/><\/figure>\n<h2>What is the SIA 118 standard?<\/h2>\n<p>SIA 118 is titled \u201cGeneral conditions for construction work\u201d. Published by the Swiss Society of Engineers and Architects, it describes in detail how a building project runs, from the award of the contract to the end of the guarantee period. The edition in force dates from 2013, supplemented by a corrigendum valid since 1 January 2026.<\/p>\n<h3>A private standard that only applies if the contract refers to it<\/h3>\n<p>SIA 118 is not a law. It is a set of contractual clauses that binds the parties only if they have incorporated it into their contract. Without that reference, the Code of Obligations alone governs the relationship, with different deadlines and mechanisms. Whoever relies on the standard must prove that it was actually agreed.<\/p>\n<p>The detail matters since 2026. The corrigendum that adapts the standard to the new law, SIA 118-C1, also applies only if it is expressly agreed. A contract that simply mentions \u201cSIA 118\u201d therefore leaves a grey area on the most sensitive point, the deadline for reporting a hidden defect.<\/p>\n<h3>Who is liable for what in a general contractor agreement<\/h3>\n<p>With a general contractor, the project owner signs a single contract for the whole building. The SIA publishes a model contract for this case, SIA 1024, available in a 2026 edition. The general contractor then hires subcontractors, but it remains solely liable to the client for all the work, including the work it did not carry out itself.<\/p>\n<p>That is the difference with a project split between separate firms, where the project owner has to work out which trade is responsible for each defect. The <a href=\"https:\/\/classorga.ch\/en\/general-contractor-amo-ame-architect-roles-geneva\/\" style=\"color:#cd1c24;\">roles of the general contractor, the AMO and the architect<\/a> are shared out differently depending on the set-up chosen. Choosing an <a href=\"https:\/\/classorga.ch\/en\/all-trades-works\/\" style=\"color:#cd1c24;\">all-trades contractor in Geneva<\/a> means having a single point of contact on the day something goes wrong.<\/p>\n<h2>Acceptance of the works under SIA 118<\/h2>\n<p>Everything starts with acceptance. That is the date from which the guarantee period and the limitation period begin to run, and it is where the fate of defects that are already visible is decided.<\/p>\n<figure><img decoding=\"async\" src=\"https:\/\/classorga.ch\/wp-content\/uploads\/2026\/09\/reception-ouvrage-verification-commune-reserves.webp\" alt=\"Empty new apartment on acceptance day, finishing defects marked with blue tape on a wall, spirit level, tape measure and checklist on the window sill\" loading=\"lazy\" style=\"width:100%;height:auto;border-radius:6px;margin:2.5em auto;display:block;\" \/><\/figure>\n<h3>The joint inspection and the acceptance report<\/h3>\n<p>When the work is finished, the contractor sends a notice of completion. The joint inspection of the building takes place within the following month, with both parties present. Its outcome is recorded in a report signed by each of them.<\/p>\n<p>If the building shows no defects, or only minor ones, it is accepted at the end of the inspection. If the defects are significant, acceptance is postponed until they have been remedied. And if the inspection does not take place within the month, for example because nobody asked for it, the building is deemed accepted. Many project owners discover this tacit acceptance too late.<\/p>\n<h3>The reservations to have recorded at acceptance<\/h3>\n<p>A defect known at the time of the inspection and missing from the report is presumed to have been accepted. The presumption can be rebutted, but it will have to be proved. The practical rule is simple. Anything that is wrong on the day of the inspection must appear in the report, even a detail, even something the contractor promises to fix the following week.<\/p>\n<p>On a large project, we advise attending the joint inspection with <a href=\"https:\/\/classorga.ch\/en\/project-management-assistance\/\" style=\"color:#cd1c24;\">project management assistance<\/a>. A trained eye spots in one visit what an owner will only see during the first winter.<\/p>\n<h2>The SIA 118 deadlines for reporting a construction defect<\/h2>\n<p>SIA 118 is more favourable to the project owner than the Code of Obligations on one precise point, the moment when a complaint can be made. In return, it gives the contractor priority to carry out repairs. The project owner must first allow a reasonable period for the defect to be remedied before demanding anything else.<\/p>\n<h3>The two-year guarantee period<\/h3>\n<p>For two years after acceptance, the project owner can report a defect at any time. The owner is not bound by the 60-day deadline that the law now sets. A leak spotted in March can be reported in June, as long as the two years have not run out.<\/p>\n<p>This is the standard&#8217;s main advantage for the client, and a good reason to check that it really appears in the contract.<\/p>\n<h3>Hidden defects and the limitation period<\/h3>\n<p>A defect that comes to light after the two years is a hidden defect. The original text required it to be reported \u201cimmediately\u201d. The 2026 corrigendum replaces that word with a clear deadline, sixty days from discovery.<\/p>\n<p>Beyond that, the right to claim for a defect is time-barred five years after acceptance. This period rises to ten years for a defect that the contractor intentionally concealed. Under Swiss law, liability for defects in a building therefore runs for five years in principle, not ten as is often assumed by analogy with the French ten-year guarantee.<\/p>\n<h2>What the revision of the Code of Obligations changes for construction defects<\/h2>\n<p>On 20 December 2024, Parliament adopted a revision of the law on construction defects, which came into force on 1 January 2026. It applies to contracts concluded since that date and changes three things for the project owner.<\/p>\n<ul>\n<li>The deadline for giving notice of a defect is now sixty days, from delivery or from discovery for a hidden defect. A contract that sets a shorter deadline is void on that point.<\/li>\n<li>The right to demand that a defect be repaired can no longer be restricted or excluded in advance when it concerns a building.<\/li>\n<li>The five-year limitation period remains in place, but no contract can shorten it any more to the detriment of the project owner.<\/li>\n<\/ul>\n<p>SIA 118 remains compatible with this new law, because its two years of free notification go further than the sixty days set by the law. The SIA 118-C1 corrigendum aligns the only point that was a problem, hidden defects.<\/p>\n<h2>The financial guarantees in a general contractor agreement<\/h2>\n<p>The deadlines protect the right to make a claim. The securities protect the ability to obtain a repair if the contractor does not perform, or if it disappears in the meantime.<\/p>\n<figure><img decoding=\"async\" src=\"https:\/\/classorga.ch\/wp-content\/uploads\/2026\/09\/immeuble-livre-garantie-defauts-construction.webp\" alt=\"Newly delivered residential building on a Geneva street, light rendered facade, glazed balconies and trees in planters, between two older buildings\" loading=\"lazy\" style=\"width:100%;height:auto;border-radius:6px;margin:2.5em auto;display:block;\" \/><\/figure>\n<h3>Retention or bank guarantee<\/h3>\n<p>During the works, SIA 118 provides for a retention on the instalments paid to the contractor. After acceptance, the guarantee for defects usually takes the form of a joint and several surety from a bank or an insurer, covering the two-year guarantee period. If a defect is not remedied, the project owner can turn to the guarantor.<\/p>\n<p>The amount and duration of this security are negotiable. They must be set out in black and white in the contract, together with the name of the institution acting as guarantor. The <a href=\"https:\/\/classorga.ch\/en\/warranties\/\" style=\"color:#cd1c24;\">warranties of a general contractor in Geneva<\/a> are settled at the quotation stage. At acceptance, it is too late to negotiate them.<\/p>\n<h3>The subcontractors&#8217; statutory lien, an often overlooked risk<\/h3>\n<p>The Swiss Civil Code gives craftsmen and contractors who have worked on a property the right to register a statutory lien on it. This right also belongs to subcontractors, even though they have no contract with the project owner. The registration must take place no later than four months after their work has been completed.<\/p>\n<p>The feared scenario is well known. The project owner has paid the general contractor down to the last franc, the general contractor has not paid a subcontractor, and the subcontractor has a lien registered on the building. The owner may then have to pay twice for the same work. Since 2026, the owner can avoid final registration by providing sufficient security, including ten years of default interest. The best safeguard remains a contract that ties payments to proof that subcontractors have been paid.<\/p>\n<h2>The points to check before signing a general contractor agreement<\/h2>\n<p>A well-drafted contract comes down to a few clauses that any project owner can check personally. Before signing, check the following points:<\/p>\n<ul>\n<li>SIA 118 is declared applicable, together with its SIA 118-C1:2026 corrigendum;<\/li>\n<li>the price is defined, fixed or lump sum, and changes go through a written amendment;<\/li>\n<li>the acceptance date and a joint inspection report are provided for;<\/li>\n<li>the security after acceptance is quantified, with its duration and the guaranteeing institution;<\/li>\n<li>payments are tied to proof that subcontractors have been paid;<\/li>\n<li>no clause shortens the notice period for defects or the five-year limitation period.<\/li>\n<\/ul>\n<p>No building project is free of defects. A contract that ticks these boxes decides who fixes them, within what time and at whose cost. This is also the moment to set the schedule, in line with the <a href=\"https:\/\/classorga.ch\/en\/project-planning\/\" style=\"color:#cd1c24;\">project planning and administrative procedures<\/a>, so that the acceptance date does not fall at random.<\/p>\n<p>Choosing a <a href=\"https:\/\/classorga.ch\/en\/\" style=\"color:#cd1c24;\">general contractor in Geneva<\/a> means buying a result and a single party responsible for it. The SIA 118 standard sets the rules for the years that follow handover. Better to have read them before signing than after the first crack.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Acceptance of the works, deadlines for reporting a defect, financial guarantees and the revised Code of Obligations in force since 2026. What the SIA 118 standard really protects in a general contractor agreement.<\/p>\n","protected":false},"author":5,"featured_media":12946,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[51],"tags":[],"class_list":["post-12954","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general-contractor"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What the SIA 118 Standard Guarantees the Project Owner<\/title>\n<meta name=\"description\" content=\"Two years to report a defect, 60 days for a hidden one, five years of limitation. What the SIA 118 standard changes in a general contractor agreement.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What the SIA 118 Standard Guarantees the Project Owner\" \/>\n<meta property=\"og:description\" content=\"Two years to report a defect, 60 days for a hidden one, five years of limitation. What the SIA 118 standard changes in a general contractor agreement.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/\" \/>\n<meta property=\"og:site_name\" content=\"Class Orga\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-28T13:35:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-28T13:35:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/classorga.ch\/wp-content\/uploads\/2026\/09\/hero-contrat-entreprise-generale-norme-sia-118.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1376\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"lory\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"lory\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/\"},\"author\":{\"name\":\"lory\",\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/#\\\/schema\\\/person\\\/3f6730db923eb8901e683fecb16733b2\"},\"headline\":\"What the SIA 118 standard guarantees the project owner in a general contractor agreement\",\"datePublished\":\"2026-09-28T13:35:21+00:00\",\"dateModified\":\"2026-09-28T13:35:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/\"},\"wordCount\":1579,\"publisher\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/classorga.ch\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/hero-contrat-entreprise-generale-norme-sia-118.webp\",\"articleSection\":[\"General contractor\"],\"inLanguage\":\"en-CH\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/\",\"url\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/\",\"name\":\"What the SIA 118 Standard Guarantees the Project Owner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/classorga.ch\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/hero-contrat-entreprise-generale-norme-sia-118.webp\",\"datePublished\":\"2026-09-28T13:35:21+00:00\",\"dateModified\":\"2026-09-28T13:35:53+00:00\",\"description\":\"Two years to report a defect, 60 days for a hidden one, five years of limitation. What the SIA 118 standard changes in a general contractor agreement.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/#breadcrumb\"},\"inLanguage\":\"en-CH\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CH\",\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/#primaryimage\",\"url\":\"https:\\\/\\\/classorga.ch\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/hero-contrat-entreprise-generale-norme-sia-118.webp\",\"contentUrl\":\"https:\\\/\\\/classorga.ch\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/hero-contrat-entreprise-generale-norme-sia-118.webp\",\"width\":1376,\"height\":768,\"caption\":\"Contrat d'entreprise g\u00e9n\u00e9rale ouvert avec onglets de couleur et stylo plume sur une table de chantier, plans d\u00e9roul\u00e9s, casque et gilet de s\u00e9curit\u00e9, grue visible par la fen\u00eatre\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/sia-118-standard-general-contractor-contract\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/classorga.ch\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What the SIA 118 standard guarantees the project owner in a general contractor agreement\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/classorga.ch\\\/en\\\/\",\"name\":\"Class Orga\",\"description\":\"Am\u00e9nagement int\u00e9rieur Gen\u00e8ve\",\"publisher\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/classorga.ch\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CH\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/#organization\",\"name\":\"Class Orga\",\"url\":\"https:\\\/\\\/classorga.ch\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CH\",\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/classorga.ch\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/logo-class-orga.svg\",\"contentUrl\":\"https:\\\/\\\/classorga.ch\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/logo-class-orga.svg\",\"width\":122,\"height\":122,\"caption\":\"Class Orga\"},\"image\":{\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/classorga.ch\\\/en\\\/#\\\/schema\\\/person\\\/3f6730db923eb8901e683fecb16733b2\",\"name\":\"lory\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CH\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a753e04e27f8637162df90210dea36bc9af2c39a9f2561130c10f724bc48134c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a753e04e27f8637162df90210dea36bc9af2c39a9f2561130c10f724bc48134c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a753e04e27f8637162df90210dea36bc9af2c39a9f2561130c10f724bc48134c?s=96&d=mm&r=g\",\"caption\":\"lory\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What the SIA 118 Standard Guarantees the Project Owner","description":"Two years to report a defect, 60 days for a hidden one, five years of limitation. What the SIA 118 standard changes in a general contractor agreement.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/","og_locale":"en_US","og_type":"article","og_title":"What the SIA 118 Standard Guarantees the Project Owner","og_description":"Two years to report a defect, 60 days for a hidden one, five years of limitation. What the SIA 118 standard changes in a general contractor agreement.","og_url":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/","og_site_name":"Class Orga","article_published_time":"2026-09-28T13:35:21+00:00","article_modified_time":"2026-09-28T13:35:53+00:00","og_image":[{"width":1376,"height":768,"url":"https:\/\/classorga.ch\/wp-content\/uploads\/2026\/09\/hero-contrat-entreprise-generale-norme-sia-118.webp","type":"image\/webp"}],"author":"lory","twitter_card":"summary_large_image","twitter_misc":{"Written by":"lory","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/#article","isPartOf":{"@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/"},"author":{"name":"lory","@id":"https:\/\/classorga.ch\/en\/#\/schema\/person\/3f6730db923eb8901e683fecb16733b2"},"headline":"What the SIA 118 standard guarantees the project owner in a general contractor agreement","datePublished":"2026-09-28T13:35:21+00:00","dateModified":"2026-09-28T13:35:53+00:00","mainEntityOfPage":{"@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/"},"wordCount":1579,"publisher":{"@id":"https:\/\/classorga.ch\/en\/#organization"},"image":{"@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/#primaryimage"},"thumbnailUrl":"https:\/\/classorga.ch\/wp-content\/uploads\/2026\/09\/hero-contrat-entreprise-generale-norme-sia-118.webp","articleSection":["General contractor"],"inLanguage":"en-CH"},{"@type":"WebPage","@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/","url":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/","name":"What the SIA 118 Standard Guarantees the Project Owner","isPartOf":{"@id":"https:\/\/classorga.ch\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/#primaryimage"},"image":{"@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/#primaryimage"},"thumbnailUrl":"https:\/\/classorga.ch\/wp-content\/uploads\/2026\/09\/hero-contrat-entreprise-generale-norme-sia-118.webp","datePublished":"2026-09-28T13:35:21+00:00","dateModified":"2026-09-28T13:35:53+00:00","description":"Two years to report a defect, 60 days for a hidden one, five years of limitation. What the SIA 118 standard changes in a general contractor agreement.","breadcrumb":{"@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/#breadcrumb"},"inLanguage":"en-CH","potentialAction":[{"@type":"ReadAction","target":["https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/"]}]},{"@type":"ImageObject","inLanguage":"en-CH","@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/#primaryimage","url":"https:\/\/classorga.ch\/wp-content\/uploads\/2026\/09\/hero-contrat-entreprise-generale-norme-sia-118.webp","contentUrl":"https:\/\/classorga.ch\/wp-content\/uploads\/2026\/09\/hero-contrat-entreprise-generale-norme-sia-118.webp","width":1376,"height":768,"caption":"Contrat d'entreprise g\u00e9n\u00e9rale ouvert avec onglets de couleur et stylo plume sur une table de chantier, plans d\u00e9roul\u00e9s, casque et gilet de s\u00e9curit\u00e9, grue visible par la fen\u00eatre"},{"@type":"BreadcrumbList","@id":"https:\/\/classorga.ch\/en\/sia-118-standard-general-contractor-contract\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/classorga.ch\/en\/"},{"@type":"ListItem","position":2,"name":"What the SIA 118 standard guarantees the project owner in a general contractor agreement"}]},{"@type":"WebSite","@id":"https:\/\/classorga.ch\/en\/#website","url":"https:\/\/classorga.ch\/en\/","name":"Class Orga","description":"Am\u00e9nagement int\u00e9rieur Gen\u00e8ve","publisher":{"@id":"https:\/\/classorga.ch\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/classorga.ch\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CH"},{"@type":"Organization","@id":"https:\/\/classorga.ch\/en\/#organization","name":"Class Orga","url":"https:\/\/classorga.ch\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-CH","@id":"https:\/\/classorga.ch\/en\/#\/schema\/logo\/image\/","url":"https:\/\/classorga.ch\/wp-content\/uploads\/2023\/07\/logo-class-orga.svg","contentUrl":"https:\/\/classorga.ch\/wp-content\/uploads\/2023\/07\/logo-class-orga.svg","width":122,"height":122,"caption":"Class Orga"},"image":{"@id":"https:\/\/classorga.ch\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/classorga.ch\/en\/#\/schema\/person\/3f6730db923eb8901e683fecb16733b2","name":"lory","image":{"@type":"ImageObject","inLanguage":"en-CH","@id":"https:\/\/secure.gravatar.com\/avatar\/a753e04e27f8637162df90210dea36bc9af2c39a9f2561130c10f724bc48134c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a753e04e27f8637162df90210dea36bc9af2c39a9f2561130c10f724bc48134c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a753e04e27f8637162df90210dea36bc9af2c39a9f2561130c10f724bc48134c?s=96&d=mm&r=g","caption":"lory"}}]}},"_links":{"self":[{"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/posts\/12954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/comments?post=12954"}],"version-history":[{"count":1,"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/posts\/12954\/revisions"}],"predecessor-version":[{"id":12955,"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/posts\/12954\/revisions\/12955"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/media\/12946"}],"wp:attachment":[{"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/media?parent=12954"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/categories?post=12954"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/classorga.ch\/en\/wp-json\/wp\/v2\/tags?post=12954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}